X

Ship Repairing
Ship Building
Product > 

SHIP’S NAME CECILIA B  

SHIP’S TYPE  BULK CARRIER

SHIP’S NATIONALITY PANAMA

SHIP’S SIZE   LOA 228.99 m

WITH32.26m

DEPTH20.05m

OWNER NATIONALITY JAPAN

GROSS TUNNAGE 43013T

DWT 82154T



KEY REPAIRING ITEMSWATER BALLAST TREATMENT SYSTEM INSTALLATION

WBTM TYPE JFE BALLASTACE

BALLAST FILTER CAPASITY 2500m3/H

PRODUCTION DRAWNING DESIGNED BY TSUNEISHI ENGEERING CO.,LTD

The total repair period for M/V CECILIA B was 14 days (2017-4-19 to 2017-5-3), including 9 days BWTs installation. It was the first time for FJHD to install the ballast water treatment system. But the program was well underway. The safety and quality were also controlled in good condition. Owner and service engineers aired their satisfaction over shipyard’s jobs and highly appreciated this successful repairing.